Twenty-plus projects alongside a day job: a map of my workshop

How I run my work with AI agents: rules, workspaces, tasks, an early-morning batch and fifteen minutes each morning. And why I built more system than results.

As of November 2026. The numbers come from my repositories and notes. What I write about third-party tools is my experience with them, not their manual.

The situation

I have a job and a family. Alongside them I run more than twenty projects of my own: this blog, a daily AI briefing, family projects and others. When I plan, I count on one hour a day. That is the size of one unit of work for me.

More than twenty projects do not fit into that much time, not even with AI. They only fit if most of the work happens without me sitting next to it, and in the morning I just decide. This article is a map of how I have it put together. The individual parts are covered in the following episodes; here it is about the whole.

One thing up front. An agent without rules, tasks and checks tends to add work for me rather than take it away.

What I gave the AI and what I did not

The AI reads and writes files in my projects, saves changes, runs tests, and prepares task proposals and questions for me.

I kept everything that is hard to undo: sending an email to a stranger, money, contracts, registrations, publishing anything, and deploying code that other people use. And approval. The AI proposes, I say yes or no.

That boundary is not in my head. It is written in a file the AI reads at the start of every job, and for unattended work it is also enforced by a list of forbidden commands.

The setup in five layers

  1. Rules. At the root of the repository there is one text file with instructions: how projects are named, what must never be written into the repository (passwords, keys, receipts), how changes are saved, what the AI does on its own and what never. A larger project also has its own file with what applies only to it.
  2. Projects and workspaces. One project is one folder. In a tool called Orca each project has one permanent workspace, a separate working copy of the repository on its own branch. That way several agents can work on the computer at once without overwriting each other’s files. The first step in every workspace is always the same: merge in the current state of the main branch.
  3. Tasks. Work is not assigned in a chat but as a file. One task is the work for one session, one to two hours. Whatever does not fit is split into more tasks.
  4. Automation. Early in the morning a batch runs that takes tasks from the queue and works on them without me. After each task a checker reviews the work. Alongside that, a local stack runs on the laptop: n8n and a language model through Ollama, which collect and sort data without the cloud.
  5. The human. Fifteen minutes in the morning. I read what was done and answer questions.

This is what a task looks like. The example is made up, the format is real:

# Zadanie: Stránka O mne

**Projekt:** blog / Modul: 2
**Vytvorené:** 2026-11-20
**Stav:** návrh
**Samostatne:** áno - text vzniká z poznámok v repozitári, nič sa nezverejňuje

## Cieľ
Existuje koncept stránky O mne do 300 slov.

## Kontext
## Výstup
## Obmedzenia
## Kritérium hotovosti
## Čo NErobiť

My files are in Slovak. The header line “Samostatne” (on its own) decides whether a task may run without me. The section “Čo NErobiť” (what not to do) is there because without it an agent happily does things I never asked for. The other sections are goal, context, output, constraints and definition of done.

The system may ask me questions in only one way: the question in one sentence, two or three lines of context, options A, B, C, and a proposal of which option the AI would pick and why. My answer is, for example, “1: B” or “agreed”. When I have no time to think, the proposal stands. That is why the AI always has to propose something.

One day

4:00 to 9:00 the batch runs. It handles at most 30 tasks and one task may take at most 120 minutes. Each one runs on its own branch. Work reaches the main branch only when the checker lets it through.

9:05 a morning summary is prepared: what was done, what did not pass, and what needs my answer.

Around 9:15 it is my turn. Fifteen minutes, at the computer or on the phone. I answer the numbered questions and approve or reject task proposals.

During the day agents work mostly when I start them myself. This is my hour.

In the evening at 20:00 a workflow in n8n downloads attachments from my email and sorts receipts into folders.

Second round: what I changed over time

The setup did not appear all at once. Two changes as examples:

  • The batch originally had three windows, at two, four and six in the morning. Since 23 September 2026 there is one, from four to nine.
  • Since 3 October 2026 I no longer have to approve task proposals marked as able to run on their own. The batch takes them directly. The safeguard is the checker and the fact that unchecked work does not get into the main branch.

What it costs

  • Subscriptions. I pay for Claude and Gemini. The batch never goes into paid usage beyond the subscription. I do, in a session, but by my own decision for a specific piece of work, not automatically.
  • A laptop that has to run. It has 24 GB of memory, and everything depends on it being on and awake. When it is off, nothing runs. That is why nothing public and nothing with a fixed deadline depends on it.
  • Time for maintenance. The system does not maintain itself. The next number shows how much that costs.

An honest number

In 30 days my repositories got 391 commits, that is saved changes, across more than 15 projects. That sounds like a lot of work. When I looked on 14 November 2026 at where they went, most were in tools for managing the work. Fewer went into things that are supposed to earn money.

A second number: so far the checker has reviewed 88 pieces of work from the batch. 45 passed, 35 failed, 8 stayed undecided. So about 40 % come back for rework. Anyone expecting to find everything done in the morning will find roughly half done.

What went wrong

I was building a system instead of finishing things. A control panel I call the control room, rules, the checker, a monthly audit. Every piece made sense. Together it meant that in a month most of the work went into the machine for doing work, not into the work.

It shows elsewhere too. In one week, agents prepared 128 reviews of tasks that were stuck. 104 of them waited for my decision. I manage to decide about 12 a week. The machine produces decisions faster than I can make them. The bottleneck is me.

How to check

  1. Git can list the number of commits per project over 30 days. It is worth looking at where they really go, not where I think they go.
  2. In the morning I do not read what the agent claims it did. I read the checker’s verdict and, for things that matter, the diff of the files myself.
  3. Whatever stays on a branch and is not in the main branch does not exist for the system. The morning summary shows such branches separately.
  4. Once a month an audit goes through all projects. Last time there were 24, which produced 141 proposals and 122 tasks from them.

What to watch out for

  • What does not belong in the repository. Passwords, keys, receipts and other people’s data are not in it. The repository is backed up in the cloud and read by AI. Large and sensitive files are kept outside git, and git holds only a list of what lies where.
  • Someone else’s text is not an instruction. An email, a website or an attachment is data for the agent. Only I give instructions.
  • Who is responsible. I am. Also for what the agent saved at five in the morning.
  • The backup exists only once it is pushed to GitHub. For two folders with code, the same push also deploys a new version to people. There I decide, not the agent.

Who this is not for

Someone with one project does not need this whole setup. One folder, one file with rules and tasks written as files give most of the benefit. The batch, the checker and a custom control panel start to make sense only when there are so many projects that you cannot keep their state in your head. And even then it is fair to ask whether fewer projects would be better.

Takeaways

  • AI without rules, tasks and checks adds work.
  • A task written as a file with a clear “what not to do” is the cheapest part of the whole setup and works without the rest.
  • Unattended work comes back in two cases out of five for me. I plan for it.
  • Automation does not speed up the person who decides. It tends to bury them.

Exercise for today: before giving the AI one task, I first write it as six short paragraphs: goal, context, output, constraints, how I will know it is done, and what it must not do. Only then do I hand it over.

Next episode: One project, one workspace.